Skip to main content
Installer setting large-format porcelain floor tile into fresh thinset on a new-construction jobsite

Builder Trade Partner • Treasure Valley

Flooring & Tile Installation Built Around Your Schedule

Clear bids, coordinated field work, consistent quality control, and punch-list closeout — for one home or repeat projects across the Treasure Valley.

Idaho General Contractor RCE-57919
Bonded
$2M Liability Coverage
Workers’ Compensation Coverage
1-Year Craftsmanship Warranty
Local Treasure Valley Company

A flooring and tile subcontractor for Treasure Valley builders

Star Contractor installs LVP, laminate, engineered and hardwood flooring, tile floors, custom showers and tub surrounds, backsplashes, fireplace and stone surfaces, and heated tile systems for home builders, custom builders, multifamily developers, and commercial general contractors across Boise, Meridian, Eagle, Star, Nampa, and the wider Treasure Valley. Bids are built from your plans and finish schedule, structured labor-only or with material coordination. To request pricing, submit your project below or call (208) 891-1890.

Why a Trade Partner

Why builders choose a dedicated trade partner

Flooring and tile touch nearly every finished surface a buyer sees. A dedicated trade partner keeps that scope predictable — in the bid, on the schedule, and at closeout.

Clear scopes and itemized bids

Pricing broken out by scope and area, so line items map to your budget and comparisons are apples-to-apples.

Schedule coordination

Install slots planned against your build schedule, with milestone communication so your super isn’t chasing status.

Consistent installation standards

The same prep, layout, and finish standards from the first unit to the last — not crew-by-crew guesswork.

Documented jobsite photos

Progress and closeout photos for your records, covering prep conditions, key details, and finished work.

Punch-list accountability

Punch items get walked, resolved, and documented — the scope isn’t done until your walkthrough says it is.

Single point of contact

One person owns your account for bids, scheduling questions, and field issues — no relay through a call center.

Trade Coverage

One sub for the full finish-floor scope

Fewer subs to sequence, one accountable contact. Scope availability is confirmed at project review.

LVP & Laminate

Click-lock and glue-down systems, prep and transitions included in scope.

Engineered & Hardwood

Nail-down, glue-down, and floating installs with acclimation and moisture checks.

Carpet

Coordination or installation reviewed per project scope and confirmed at bid.

Tile Floors

Porcelain, ceramic, and stone floors with substrate prep and layout planning.

Custom Showers & Tub Surrounds

Waterproofed assemblies built to spec, from production baths to custom masters.

Backsplashes

Kitchen and utility backsplashes matched to finish schedules and selections.

Fireplace & Stone Surfaces

Fireplace surrounds and interior stone features set to plan details.

Heated Tile Systems

Electric radiant systems under tile, tested and documented before cover.

Baseboard, Trim & Transitions

Base, quarter round, and flooring transitions to close out the scope cleanly.

Project Types

New constructionProduction & custom homesMultifamily turnsLight commercialModel homesWarranty & punch work

Availability for each project type is subject to scope review.

Flooring installer tapping luxury vinyl plank into place with a mallet during new-home construction
Tile setter sealing a shower niche with bonded waterproofing membrane before wall tile is installed

Company Proof

Proven across flooring, tile, and complex finish work

Star Contractor delivers flooring, wet-area tile, and the finish details that get scrutinized at walkthrough — led directly by the owner on every job.

RCE-57919

Licensed Idaho general contractor

1-Year

Craftsmanship warranty on every project

Substrate & moisture verification

Subfloor flatness and moisture are checked before install — materials are acclimated on site, and out-of-spec conditions are flagged in writing before work proceeds.

Waterproofing & flood testing

Shower assemblies get sheet-applied or bonded waterproofing with a flood test before a single tile goes up.

Heated tile systems

Electric radiant systems are installed and tested before cover, then verified on a programmable thermostat at closeout.

Transitions, base & trim

Stair nosing, reducers, undercut casings, and base and shoe details close the scope cleanly at every material change.

Progress photos

Prep conditions, waterproofing, and key details are photographed for your file — not just the finished surface.

Punch documentation

Punch items are walked with your super, resolved, and recorded per unit for warranty reference.

Every project follows the same documented sequence — see how we run projects from estimate to closeout and what the 1-year craftsmanship warranty covers.

Process

How we work with your team

A predictable sequence from plans to closeout, with issues surfaced early instead of on install day.

  1. Plans & specs received

    Send plans, finish schedules, and selections. We confirm receipt, identify your field contact, and flag anything missing before takeoff starts.

  2. Scope review & takeoff

    Quantities come off the plans. RFIs, substrate or moisture questions, and sequencing conflicts get raised now — not mid-install.

  3. Builder pricing

    Itemized pricing by scope, labor-only or with material coordination as requested, with a clear basis for change orders.

  4. Scheduling & pre-install check

    Install slot confirmed against your schedule. Material readiness, site access, and substrate conditions are field-verified before crews mobilize.

  5. Installation & photo documentation

    Work installed to consistent standards with progress photos. Field conditions that change scope are documented as change orders before extra work proceeds.

  6. Punch & closeout

    We walk the scope with your super, resolve punch items, and hand over closeout photos and records for your file.

Bid Checklist

What we need for an accurate bid

The more of this you can send, the tighter the number. Missing items just become questions during scope review.

Plans and finish schedule
Project address or community
Flooring and tile selections
Scope responsibility (labor-only vs. material coordination)
Square footage or unit count
Desired start and completion dates
Substrate conditions, if known
Stair, shower, and custom-detail counts
Occupied vs. vacant / new construction
Billing requirements
Insurance / vendor onboarding needs
Primary field contact

Scope Structure

Labor-only or coordinated materials — your call

Both structures carry the same installation standards and documentation. The difference is who owns material quantities, ordering, and delivery timing.

Comparison of labor-only and coordinated-material bid structures
Scope elementLabor-onlyWith material coordination
Plan takeoff & quantitiesIncludedIncluded
Material orderingBuilder suppliesWe quantify, order & track
Delivery staging & readinessBuilder confirms on siteConfirmed against your schedule
Substrate prep & installationIncludedIncluded
Change ordersPriced in writingPriced in writing
InvoicingLabor onlyLabor + materials

State your preferred structure when you submit the project — pricing is returned itemized either way.

Repeat Work

Built for repeat work

Whether it’s a single custom home or the same plan across a community, pricing and scheduling can be structured to fit how you build.

  • Per-project bidding

    Standard plan-based pricing for one-off projects — no volume commitment required.

  • Community & model packages

    Scope packages priced per plan for communities, models, and spec inventory.

  • Repeat plan pricing

    After field verification on the first units, repeat plans can carry standing pricing so rebidding isn’t needed every start.

  • Change-order documentation

    Scope changes priced and documented in writing before extra work proceeds.

  • Phase scheduling

    Install phases sequenced with your trades — one home at a time or staggered across starts.

  • Closeout records

    Photo documentation and punch records retained per unit for warranty reference.

Wide-plank oak flooring and an oak staircase in a two-story living room

Service Area

Treasure Valley coverage

We work across Ada and Canyon County and the surrounding Treasure Valley. Projects outside these areas are reviewed per project.

BoiseMeridianEagleStarNampaCaldwellKunaMiddletonGarden CityHidden SpringsEmmett+ surrounding Ada & Canyon County areas

Building in a specific city? See our local pages for tile and flooring in Boise, Meridian, Eagle, and Star.

Request Builder Pricing

Tell Us About Your Project

Share what you have — even partial details are enough to start a scope review. We’ll come back with questions, a pricing timeline, and an itemized bid.

We review your scope and confirm a pricing timeline.

We call or email with any takeoff questions.

You receive itemized pricing, structured the way you asked for it.

Prefer to talk it through?

(208) 891-1890

Monday – Friday, 7am – 5pm MT

Your company
The project

Scopes needed

PDF, JPG, PNG, DOC/DOCX, or XLS/XLSX — up to 3 files, 3 MB in total. Files are emailed directly to Star Contractor and are never public. Plans can also be emailed after submission.

Prefer to talk first? Call (208) 891-1890.

Common Questions

Builder FAQ

Have a project going to bid?

Send the plans — we’ll confirm a pricing timeline at scope review.